|

| |
TEMPORARY USE PERMIT ZBA 007 PROCEDURES
This permit is used for the following reasons:
Section 3.07 - Mobile homes are permitted as a temporary use in all residential
areas for a period not to exceed six (6) months, unless and until the Zoning
Administrator grants an extension for documented reason. Upon payment of an
additional fee for each extension, as prescribed in "(j)" of this section,
additional extensions totaling up to twenty-four (24) months may be granted by
the Zoning Administrator in a six (6) months increment with each additional
extension requiring payment of the fee prescribed in "(i)" of this section.
(Temporary occupancy fee - $5.00 per 6 month period)
Section 3.10 (a) Temporary building or yard for construction
materials and/or equipment, both incidental and necessary to construction in the
zoning district shall be issued a permit by the Zoning Administrator before
construction commences. Each permit shall be valid for a period of not more than
six (6) calendar months and shall not be renewed for more than four (4)
successive periods at the same location.
(b) Temporary office, both incidental and necessary for the sale
or rental of real property in the zoning district shall be issued a permit by
the Zoning Administrator. Each permit shall specify the location of the office
and area and shall be valid for a period of not more than six (6) calendar
months and shall not be renewed for more than four (4) successive periods at the
same location.
(c) Temporary real estate signs exceeding twelve (12) square feet require
permits issued by the Zoning Administrator and are valid for a period of not
more than six (6) calendar months and shall not be renewed for more than four
(4) successive periods at the same location. Such signs may be located only on
premises of, and identifying or advertising land and/or structures being sold,
leased, rented or remodeled thereon.
(d) The stripping of soil requires a permit issued by the Zoning
Administrator. Each permit shall specify the location of the area and be
accompanied by a plan for the ultimate development of the land and shall be
valid for a period of not more than six (6) calendar months and shall not be
renewed for more than two (2) successive periods at the same location (and)
Section 17.02(d) The Zoning Administrator shall also administer the provisions
of PA 347, the Soil Erosion Act of 1972, in regards to any exchange of soil or
earth that exceeds one acre or is within 500 feet of a lake or a river.
A. Submit Temporary Use permit application to the Village Clerk include the
following:
Required fee
Location of property involved in request
Name and address of applicant
Legal description of property
Present zoning of property
Type or permit requested (original or renewal which renewal)
Site plan (to scale) including - property lines; all existing and new
buildings/fixtures; exact distances between all existing and new
buildings/fixtures; exact distances between all property lines and existing and
new buildings/fixtures
For soil stripping only: Exact location of the area being striped (site plan of
area)
Plan for the ultimate development of the land
B. Zoning Administrator will approve or deny request
(responses that dont encounter any problems or need special
consideration should be completed within 30 days)
C. Approved request (with or without stipulations)
Use as approved reapply if needed - in 6 months time - for renewal of this
permit
D. Denied request
1. drop request
2. apply for variance request (See procedures for needed variance
for additional information)
ZBA007 TEMPORARY USE PERMITS
VALID FOR 6 MONTHS FROM APPROVAL
Requires approval of Zoning Administrator
Temporary permits - Section 3.07 & 3.10
Section 3.07 - Mobile homes are permitted as a temporary use in all residential
areas for a period not to exceed six (6) months, unless and until the Zoning
Administrator grants an extension for documented reason. Upon payment of an
additional fee for each extension, as prescribed in "(j)" of this section,
additional extensions totaling up to twenty-four (24) months may be granted by
the Zoning Administrator in a six (6) months increment with each additional
extension requiring payment of the fee prescribed in "(i)" of this section.
Section 3.10
(a) Temporary building or yard for construction materials and/or equipment, both
incidental and necessary to construction in the zoning district shall be issued
a permit by the Zoning Administrator before construction commences. Each permit
shall be valid for a period of not more than six (6) calendar months and shall
not be renewed for more than four (4) successive periods at the same location.
(b) Temporary office, both incidental and necessary for the sale or rental of
real property in the zoning district shall be issued a permit by the Zoning
Administrator. Each permit shall specify the location of the office and area and
shall be valid for a period of not more than six (6) calendar months and shall
not be renewed for more than four (4) successive periods at the same location.
(c) Temporary real estate signs exceeding twelve (12) square feet require
permits issued by the Zoning Administrator and are valid for a period of not
more than six (6) calendar months and shall not be renewed for more than four
(4) successive periods at the same location. Such signs may be located only on
premises of, and identifying or advertising land and/or structures being sold,
leased, rented or remodeled thereon.
(d) The stripping of soil requires a permit issued by the Zoning Administrator.
Each permit shall specify the location of the area and be accompanied by a plan
for the ultimate development of the land and shall be valid for a period of not
more than six (6) calendar months and shall not be renewed for more than two (2)
successive periods at the same location. (and) Section 17.02(d) The Zoning
Administrator shall also administer the provisions of PA 347, the Soil Erosion
Act of 1972, in regards to any exchange of soil or earth that exceeds one acre
or is within 500 feet of a lake or a river.
Cost of permit - $ 5.00 paid___
Date ___________________
I. Location of property: _______________________________________________________
Name of applicant: ______________________________Telephone # __________________
Address of applicant: _________________________________________________________
Please attach a copy of the legal description of property
Present zoning classification: M_ B-1 _ R-2 _ R-1 _ F-1 _ PUD _ RR _ other:
____________
II. Type of permit requested: __________________________________________________
___ Original request ___ renewal request (1, 2, 3, 4 circle one)
Applicant must complete parts I and II and a site plan must be drawn on the
reverse side of this form or attached in another form of your choice.
III. Action by Zoning Administrator: Denied __ Approved __ Approved with
stipulations __
Section (s) of the Zoning Ordinance involved:
___ Temporary building - Section 3.10(a)
___ Temporary office - Section 3.10(b)
___ Temporary real estate sign Section 3.10(c)
___ Stripping of soil Section 3.10(d) & Section 17.02(d)
Additional notes: ____________________________________________________________
Review of property as it pertains to the provisions of the Zoning Ordinance:
(Zoning Administrator should indicate requirements and whether satisfied)
__________________________________________________________________________
__________________________________________________________________________
_____________________________
_______________________________
Signature of Zoning Administrator
Date
If the applicant disagrees with the interpretation of the Zoning Ordinance, as
made by the Zoning Administrator, the applicant may appeal the determination to
the Zoning Board of Appeals. Applicant must complete the variance permit form
and upon payment of the appeals fee, a hearing will be scheduled. Application
must be presented to the Village Hall.
NOTE filling this application implies that the property owner is giving
permission for the Zoning Administrator to visit, walk on or around the property
to investigate the application request when/if needed.
|
ZBA007 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PG 2 |
|
VILLAGE OF NASHVILLE |
|
TEMPORARY USE PERMITS |
|
VALID FOR 6 MONTHS FROM APPROVAL |
|
Requires approval of Zoning Administrator |
   
|
Masonary (wall bearing) |
1. No of stories |
|
|
|
Parking spaces |
|
|
|
|
|
|
Wood Frame |
2. Total square feet of floor area |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Structural Steel |
all floors based on exterior |
|
|
Enclosed |
|
|
|
|
|
|
Reinforced Concrete |
dimensions |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other - specify |
3. Total Land are - sq ft |
|
|
Outdoors |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Type of Sewage Disposal - |
Type of Water Supply |
|
|
Residential Building only |
|
|
|
|

|
Public or private company |

|
Public or private company |
|
|
No. of bedrooms |
|
|
|
|
|
|
Private (septic tank, etc.) |
|
Private (well, cistern) |
|
|
No. of bathrooms - full |
|
partial |
|
|
|
|
Site or Plot Plan |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lot Size: |
|
|
|
|
|
|
Additional detailed drawings / diagrams may be required. It is
recommended that all |
|
|
|
|
|
|
|
|
|
|
drawings be to scale and properly dimensioned. Improper drawings will be
rejected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Note - site plan must be drawn to scale and include property lines,
current buildings, all new buildings/fences (including height of fences)
and the |
|
exact distance between buildings and between buildings and property
lines. Each square on this grid - 5 ft (which makes the graph 150 ft
wide |
|
by 125 ft tall). Other drawings should be attached sufficient to show
your planning. Two copies each are required. |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
6/1/06 |
|