PROCEDURES FOR ZBA 009 –
SITE PLAN REVIEW
This form is required by the zoning
ordinance for: Private streets in PUD developments/New construction on empty lot/Razing of old building and replacing it with
new structure/Change of use of current building in business district – i.e. residential to business use
All site
plans must follow the current Zoning Ordinance
A. Submit a site plan review request to the Village Clerk – include the following:
Required fee
Location of property involved in request
Name and address of applicant
Present zoning of property
Statement of request
Attach
the following items to the request form:
Legal description of property
Current survey of property
Black line or Blue Print drawing to scale as prescribed
in the current Zoning Ordinance. The scale drawing must include - property lines; all existing and new buildings/fixtures;
exact distances between all of the following: existing buildings/fixtures, new buildings/fixtures, property lines and any
of the previously stated buildings/fixtures.
17.05 - Every application for a Site Plan Review shall be accompanied by plans in duplicate, drawn
to scale in black line or blueprint, showing the shape and dimensions of the lot to be built upon or to be changed in its
use; the exact location, size and height of building or structure and the intended use to be made thereof. One
copy of such plans shall be returned to the owner when such plans shall have been approved by the Zoning Administrator and
the Planning Commission together with a Zoning Permit as needed.
B. The request will be given to the Zoning Administrator and the Planning Commission
C. At the next scheduled meeting, the Planning Commission will set a public hearing
Usually scheduled for the next months Planning meeting – this allows for the notifications
sent to the neighboring residents and a notice to be published in the paper
(Planning meets once a month on the first Tuesday of the month)
D. Property owner submitting request should attend the public hearing to answer any questions asked.
E. Approved request (with or without stipulations)
Take approved request
to Barry County for required building permits
PCI (Professional Code Inspections of MI)
109 S Church St
Hastings, MI
269-948-4088
F. Denied request
1. drop request
2. reapply to Zoning Administrator
(with any revisions needed)
ZBA009
VILLAGE OF NASHVILLE
SITE PLAN REVIEW
Requires
Public Hearing by the Planning Commission
(Required for: Private streets in PUD developments/New construction on empty
lot/Razing of old building and replacing it with new structure/Change of use of current building in business district –
ie residential to business use)
Cost
of permit - $200 - paid___
Date ___________________
I.
Location of property: ______________________________________________________________________
Name of applicant: _______________________________________Telephone
# ________________________
Address
of applicant: ________________________________________________________________________
Present zoning classification: M____
B-1 ____ R-2 ____R-1 ____ F-1 ____ PUD ____ RR ____ other: _______________________
II. Applicant’s request:
_______________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
III. Please attach
a copy of the following:
Legal description of property
Current survey
of property
Black line or Blue Print drawing to scale as prescribed in the current Zoning Ordinance
17.05
- Every application for a Site Plan Review shall be accompanied by plans in duplicate, drawn to scale in black line or blueprint,
showing the shape and dimensions of the lot to be built upon or to be changed in its use; the exact location, size and height
of building or structure and the intended use to be made thereof. One copy of such plans shall be returned
to the owner when such plans shall have been approved by the Zoning Administrator and the Planning Commission together with
a Zoning Permit as needed.
All site plans must follow the current Zoning
Ordinance
Applicant
must complete parts I, II and III.
Public
Hearing requirements as follows
Notice
in paper placed on ___________________ Letter sent to residents within 300’
on _________________
III. Action by Planning Commission:
Approved ____ Denied ___ Public Hearing Date __________________
Denial based on the following provisions of Zoning
Ordinance: ______________________________________
Approval
stipulation (Zoning Administrator should indicate any requirements stipulated by the Planning Commission for approval of this
site plan)
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
________________________________________________________
_________________________________________
Signature
of Zoning Administrator
Date
NOTE –
filling this application implies that the property owner is giving permission for the Planning Commission members to visit,
walk on or around the property either individually or as a group, to investigate the application request
when/if needed.
Office use only - attach
the following to the completed filing of this form: Minutes of Planning Commission – setting the Public Hearing / Holding
the Public Hearing / final approval or denial; Copies of Ad placed in the paper / Letter sent to residents within 300’
of site plan and list of those residents receiving letters.